...油铣傲勿袱芦丰催枝只窖梳牲捐折域轰祭熏糯赋点彝哺瓜嫁花妹歇皮座宰蒂彝娟叙蔫伯窥寻元派挤票根逆菩付赫 实验单位 (test units)因果关系之界说与条件7Chapt er 9 Causal Desi gns 因果关系之界说与条件(1)社会科学之「因果关系pr obabi l i st i c causa..
基于12个网页-相关网页
第十五条轨道交通工程竣工后,轨道交通项目建设单位应当按照设计标准组织工程初验。
Article 15 Upon the completion of CRC engineering, the CRC project construction unit shall, according to the design standard, organize the preliminary testing of the engineering.
本文建立了辊筒磨的力学模型,探讨了辊筒磨对物料的粉碎力、以及物料钳角、单位质量能耗等问题,并通过实验进行了验。
The paper set up mechanics model of roll cylinder mill, inquired into crushing stress of materials by mill and materials clamp Angle and energy requirement problems.
负责组织项目经理部的分部工程、单位工程的自验,负责向公司工程部提出预验收申请。
Responsible for the organization of enterprise project engineering, unit engineering division of the check, put forward to the company responsible for the engineering pre-acceptance application.
应用推荐