先张法预应力空心板梁在冬季施工过程中,易产生裂缝。
It is easy to bring crack that pretensioned prestressed hollow slab beam is constructed in winter.
就先张法预应力混凝土空心板梁的施工过程作了详细的介绍,对施工中存在的问题作了相应的改进措施。
The paper introduces specific construction process of pretensioning cored slab beam at some length, improves existing problems in construction.
通过对先张法预应力梁板预拱度产生的过程进行分析,揭示预应力梁板预拱度产生的内在原因。
The paper analyses the formation process for pretensioning prestressed hollow plank precamber, announces inside reason for prestressed hollow plank precamber to public.
应用推荐