查龙电站面板堆石坝坝体及沙砾石副坝填筑体按不同填筑区填筑沙砾石料。
Sand and gravel are filled in different zones in embankment dam with concrete face slab and auxiliary embankment dam at Chalong Hydropower Station.
海潮坝面板堆石坝在施工中调地制宜采用堆石料洞室爆破,级配符合设计要求。
During the construction of decked rockfill dam for Haichaoba Reservoir, chamber blasting was applied with local conditions, and the graduation agreed with THC design requirements.
利用ABAQUS提供的用户材料子程序UMAT的二次开发平台开发土石料的沈珠江双屈服面模型,并以一面板堆石坝为例,结合ABAQUS的“单元增加/去除”技术进行了坝体施工和水库蓄水的仿真分析。
The user material subroutine UMAT provided by the general software ABAQUS was used for programming for Shenzhujiang s double-yield surface model of earth rockfill materials.
应用推荐