对钱清热电厂贮灰场排水的水量、水质进行分析,并根据贮灰场所处的地理位置,设计了一套灰雨水处理系统。
Through the analysis of the ash yard effluent in Qiangqing thermal power plant, and according to the position of the ash yard, an ash effluent and rain water treatment system has been designed.
如果没有可用的废水处理系统,可经市政或私人下水道的授权将中和的废液流到污水下水道。在任何情况下,任何形式的废液都不允许进入雨水下水道。
Should a site waste treatment system not be available, permission could be obtained from the municipal or private sewer authority to put neutralized waste solutions to sanitary drains.
应用推荐