此类限制通常是对应用程序的某些部分实施的,比如中断处理程序,其响应中断的代码必须在给定的时间范围内完成工作。
Such restrictions are typically placed on sections of the application such as an interrupt handler, where the code responding to the interrupt must complete its work in a given time period.
首先,它能对最大或平均响应DRM服务器时间实施限制。
First, it can impose limits on maximum and average response DRM server times.
如果没有在峰值负载下积极测试和验证集群,那么在真正发生故障时,故障转移的一端可能受到资源限制,响应时间较长,甚至出现故障。
If you do not actively test and validate your clustering during peak loads, during an actual failure the failover side can become constrained and deliver poor response times or even fail.
应用推荐