施工实践表明:在开挖、浇筑、防水、降水、质量控制各环节采用相应技术措施,可取得良好的技术经济效果。
The construction technologically and economically achieved amply by adopting variety of quality control measures to excavation, concrete pouring, waterproof and dewatering etc.
通过某工程实践,简要介绍了PVC防水卷材的施工工艺及质量控制要点。
The authors introduce the construction methods and quality control key points of the PVC waterproof coil through a real project.
建筑防水;全面质量管理;材料质量控制;设计质量控制;施工质量控制;g - TQM模式。
Building waterproof; total quality management; materials quality control; quality control of the design; construction quality control; G-TQM model.
应用推荐