针对铜闪速炉冰铜温度预测问题,提出了一个基于智能集成策略的预测模型。
In order to estimate the matte temperature of copper flash smelter, an estimation model based on intelligent integrated strategy is put forward.
在铜闪速炉炼生产过程中,入炉铜精矿的水分是一个非常重要的参数,必须通过气流干燥过程控制在0.1 ~ 0.3%之间。
In the process of copper flash smelting, because the moisture contents of copper ore is a very important parameter, it must be controlled between 0.1-0.3% by pneumatic drying.
介绍了江西铜业公司贵溪冶炼厂闪速炉废热锅炉的安全检修方案和方法以及检修中的一些注意事项。
Safety inspection methods and some points for attention are introduced to waste heat boiler of flash furnace in Guixi Smelting Plant, Jiangxi Copper Industry Co.
应用推荐