渡轮遇到恶劣天气或其它不可测因素而导致汽渡码头靠墩钢管桩水下断裂情况的发生。
In case of bad weather or other unpredictable reasons, underwater break of steel tube stake of steam-ferry dock supporting frusta might be happened.
近年来,在大型深水港码头、跨海大桥工程中,大型开口钢管桩已得到越来越广泛的应用。
In recent years, The large-scale open-ended steel pipe piles have been more and more widely applied in large scale deep water docks, Sea-Crossing Bridge Projects.
根据海洋钢管桩防腐需要研究开发的管道三层结构防腐涂层技术,已在丹东港码头钢管桩防腐工程中应用。
A technology of three - layer corrosion prevention coating has been developed and used in the corrosion prevention project of steel pipe piles in Dandong dock.
应用推荐