...石基层;配合比设计;试验段施工 [gap=203]Key words] big pore of the cement stable macadam; Mix design; Construction stage ...
基于16个网页-相关网页
最后,论文通过实体试验段工程分析了隧道内连续配筋混凝土路面板及其端部锚固的施工工艺及组织顺序,并给出了相应的质量检验标准。
Finally, through the pilot the paper analyzed the construction sequence of the CRCP and its end fixing equipment, and the corresponding quality checking standards.
介绍了秦沈客运专线A14试验段软土路基工程设计施工情况。
The design and construction situations of A14 testing section soft soil roadbed on Qinhuangdao-Shenyang passenger transport special railway line are introduced.
为探讨盲沟排水对路基下碎石桩加固的软土地基的工程特性的影响,进行了路基试验段的对比试验,并在路堤填筑施工中进行了孔隙水压力和地基沉降测试。
To analyze the effect of the blind drainage system on the engineering characteristics of the ground improvement by gravel pile, the contrast tests were carried out on roadbed testing segment.
应用推荐