本文从冻结站节能优化设计、施工管理控制等方面探讨冻结工程节能降耗的几点看法与认识。
The paper gives some suggestion of optimized energy saving design of freezing work and construction control on energy saving in freezing engineering.
最后对场区地基工程处理措施及填方体设计与施工提出优化建议。
At last, the optimization suggestion on the engineering disposal measure to the site foundation and the design as well as construction of the embankment is brought forward.
根据国内许多行业计算机网络集成综合布线工程的方案设计与施工实践,提出较为优化的结构布线设计方案。
According to the domestic many computer network integration synthesis wiring plan design and construction practice, proposed optimizes structure wiring design proposal.
应用推荐