...构;防裂措施;设置后浇带;配置构造筋 [gap=496]Key words】Long building structure;Crack control measures;Poured band set;Configuration constructed tendon ...
基于16个网页-相关网页
在钢筋混凝土结构中设置后浇带是目前常采用的一种方法。
It is a common practice to set embedded joint in the construction of mass concrete structure.
通过采取设置后浇带,优化混凝土配合比,控制原材料质量等措施,保证环梁基础不产生裂缝。
Some measures of setting late poured band, optimizing mix proportion of concrete and controlling raw material quality can assure no cracks in circle beam foundation.
超长混凝土结构的设计和施工中可以采取设置后浇带、采用微膨胀——补偿收缩混凝土或设计无粘结预应力混凝士结构来防止温度收缩裂缝的产生。
The designer can set post-pouring belt, using UEA con- crete and designing pre-stressing concrete structure to avoid the crack caused by temperature and shrinkage.
应用推荐