管架集团工程总监(PSG)将对照供应商的建议要求,对经认可的设计报告进行评审,并提出相关行动意见。
The PSG Engineering Director will review the approved design report against the proposed deviation and advise on a course of action as appropriate.
评审人员,将供应商提出的建议要求记录在经认可的设计报告中,并将详情提交给管架集团工程总监(PSG)评审和验收。
The reviewer will consider the implications of the proposed deviation on approved design reports and in such instances will forward details to the PSG Engineering Director for review and acceptance.
拒绝,要求重新设计。如果客户提出的替代方案可以被接受,而需要对经认可的设计资料进行修订时,将与该供应商联系,要求其接受附带成本费用。
Reject subject to redesign. When a deviation may be accepted but would require revision to approved design data, the vendor will be contacted requesting that associated costs are accepted.
应用推荐