计划编制过程(Final Concept) 规划目标的细节 大致50个座位 主要供应健康食品(Healthy Food) 营业时间为星期一到星期六,每天中午到晚上10点(可能更迟) 营...
基于12个网页-相关网页
架构设计能够支持计划编制过程。
铁路车站作业计划编制过程中,调机运用计划是调度指挥的关键。
The key point of dispatching command during the process of drawing operative scheme for railway stations is the shunting locomotive operation plan.
铁路车站作业计划编制过程中,调机运用计划是调度指挥的关键。
The key problem of how to make the plan of using yard engines in the process of making operative plans for the station is studied in this paper.
应用推荐