电厂在开机时直到电厂达到自动控制工作范围的负荷水平前,控制功能须手动完成。
The control function must be accomplished manually during plant startup until the plant is at a load level that is in the operating range of the automatic controls.
燃烧周期的自动调整,加快了负荷大幅变化时燃烧控制的响应速度。
The automatic adjust of burning cycle promotes response speed to burning control as the load with a big changing.
燃烧周期的自动调整,加快了负荷大幅变化时燃烧控制的响应速度。
Its automatic adjustment of burning cycle accelerates the response speed of burning control in accordance with remarkable load increases.
应用推荐