将广义成本定义为行驶时间、道路拥挤度、路段可靠性三者的线性加权和。
The generalized cost was defined as the linear weighted sum of travel time, traffic congestion degree, and section reliability.
利用线性加权和法,建立了评价函数,将多目标优化问题转化为单目标非线性规划问题。
By linear weighing-sum method, the multi-objective optimization was converted into a linear programming problem with the evaluation equation. Process parameters were optimized with SQP algorithm.
对三目标的非线性优化设计问题,采用了线性加权和的方法,其中加权因子系用像集方法算出。
The linear weighted aggregative method is used for three objective nonlinear optimization problem. In which weighing factors are calculated with the method of image sets.
应用推荐