通过满足暂态电压安全约束的无功发电调节与切负荷总代价最小化问题,来表示暂态电压安全风险。
Transient voltage risk can be calculated by optimizing the total cost for generator adjustment and load shielding under restrictions of transient security.
所描述的问题为在平行机台上调度具有单一模具约束的成组工作,以实现最小化总拖期量为目标。
The problem of scheduling jobs with chain precedence constraints on identical parallel machines is discussed in this article.
研究三个并行处理器环境中,具有递减链约束的多处理器任务的调度问题,调度目标是最小化总处理时间,假设单项任务需单位处理时间。
This paper focuses on scheduling unit length multiprocessor tasks with de-creasing chain precedence constrains on three identical processors so as to minimize makespan.