在并发GC运行的某些阶段,需要将托管线程挂起两次,这可能会花费一些时间。
During a concurrent GC we need to suspend managed threads twice to do some phases of the GC. These phases could possibly take a while to finish.
在高压试验或处理结束时,必须将处理管线和相关系统内的压力安全地放泄,以使能够继续进行以后阶段的作业。
At the conclusion of high-pressure tests or treatments, the pressure within the treatment lines and associated systems must be bled off safely to enable subsequent phases of the operation to continue.
在图形管线的光栅化处理阶段,本文对实时光照技术和纹理技术进行了具体的研究。
In the rasterization processing stage of the 3d graphics pipeline, we did solid research on real-time and texture mapping technique.
应用推荐