传统的电气设备检修制度已不能适应现有电气设备运行需要。
The conventional overhaul system of electrical equipments has failed to meet the need of the maintenance of current electrical equipment.
利用规定的试验间隙,对多个油样进行交替加压,可以缩短总的试验时间,为加快充油电气设备的检修提供了条件。
To pressure the oil sample alternatively in specified test gap may shorten the test time and guarantees inspection of electrical equipment for oil charging.
阐述了电气设备的在线监测工作是开展状态检修的前提条件;
The writer proposes that state-based maintenance is scientific, reasonable and economic, and that on-line monitoring of electric equipment is prerequisite conditions of state-based maintenance.
应用推荐