在规划会议期间,对于迭代开发计划安排中的每一个用户描述,团队需要分解所有必需的任务,以便对描述进行详细周到的分析。
During the planning meeting, for each user story in the iteration backlog, the team needs to break down all the tasks required for the story to be considered complete.
我们已安排展示以帮助不断增加的Mylyn用户管理大任务列表。
We've created scheduled presentation that will help the growing number of Mylyn users that manage very large task lists.
如果某个特性需要进行架构研究,那么将它的用户描述添加到计划安排中并具备“设计”、“构建原型”或“调研”等任务。
If an architecture spike is required for a feature, add a user story for it to the release backlog and have tasks such as "Design," "Building Prototype," or "Research."
应用推荐