...生产试验和检验 英文名称: Transportable gas cylinders - Gas cylinder valves - Manufacturing tests and inspections 版本: 附注: 标准状态: 现行 载体: 加工电子 中国标准分类: 【J16】 国际标准分类(ICS): 【23.06..
基于6个网页-相关网页
制造部负责生产过程半成品或成品检验和试验状态的标识。
The Manufacturing Department is responsible for identifying the inspection and test status of the semi-finished products or the finished products in production process.
采购或生产制造开始之前,合同专业检验试验计划(itp)应充分明确检查、无损检验(nde)和性能试验介入点。
Prior to procurement or commencement of manufacture, the inspection, NDE and performance testing intervention points shall be adequately defined in a contract specific inspection and test plan (ITP).
经核准的检验试验计划(ITP)由生产工程部(PED)发放至所有部门,以便在生产制作期间,确定内部检验和客户检验要求。
The approved ITP will be issued by PED to all departments so that internal and client inspection requirements are identified during manufacture.
应用推荐