单工厂有能力约束生产批量计划问题(Capacitated lot-sizing problem, CLSP)已经是一个NP难题,分布式多工厂生产批量计划问题不但要解决各工厂的生产批量计划,还有合理分配订单到各...
基于4个网页-相关网页
多级生产批量计划问题 multilevel lot-sizing problem
从荒管切割的角度研究热轧钢管生产批量计划问题。
This paper deals with production lot planning of steel pipe from the view point of cutting stocks.
本文提出了用于求解单级多资源约束的生产批量计划问题的改进二进制粒子群算法,阐明了算法的具体实现过程。
In this paper, the improved particle swarm optimization algorithm for the single level capacitated dynamic lot-sizing problem is presented. The detailed realization of the algorithm is illustrated.
在分析热轧生产批量计划通用模型的基础上,采用了带有时间窗的车辆路径问题模型。
The VRPTW model that is suitable to resolve the problems of the production lot planning of the hot rolling strip is suggested.
应用推荐