针对600 MW机组启动过程中推力瓦温度高及轴向位移范围超常的问题,从形成原理及现场安装两方面加以分析,并提出处理策略。
This paper aims at the high thrust pad temperature and abnormal axial displacement problem during the start-up course of 600 MW Supercritical Units.
将热力学计算与现场试验相结合,确定了该法的脱磷期控制温度范围。
Based on thermodynamics and experiments, the temperature range for dephosphorization was obtained.
应用推荐