它们对某试验快堆的安全运行和物理启动可能是有用的。
Some useful results which could be applied to reactor operation and physical start-up of acetain experimental fast reactor have been obtained.
介绍了10 MW高温气冷实验堆的数字化物理启动中子注量率监测系统的设计和功能。
This paper introduces a design of digital neutron flux monitoring system for 10mw high temperature gas cooled reactor and its performances.
因此,如果您使用了LPAR或相关技术,那么需要做好准备,因为在另一个物理机器上启动部署管理器虚拟映像可能会出现机器故障。
Thus, if you do use LPAR or related technologies, you'll need provisions for starting the deployment manager virtual image on another physical machine should a machine fail.
应用推荐