结果显示,总漏水量因实施优化检测周期而减少,漏损控制费用降低。
The results indicated that water loss and the total cost of water leakage control decreased because of the optimal inspection interval.
减少反击式水轮机导叶全关后的漏水量是改善水轮机结构性能的重要课题之一。
To decrease the leakage of full closed wicket gate of reaction turbine is an important subject of improving the constructional characteristic of water turbine.
最后,利用水量平衡法分析了研究库区的渗漏水量,得到橡胶坝库区的渗漏系数。
Finally, using the the analysis of water balance method to study the leakage of reservoir water, get the leakage coefficient of rubber dam in the reservoir area.
应用推荐