对泥水式盾构机应用于穿黄隧洞的施工进行了探讨。
The application of slurry shield machine to this tunneling project is discussed.
南水北调中线工程穿黄河输水隧洞推荐采用泥水加压式盾构施工。
Slurry shield tunnelling was recommended to bore through water supply tunnel across the Huanghe along the Middle Pipeline of South-to-North water diversion programme.
应用推荐