沉降后浇带混凝土提前浇筑,约在混凝土整体收缩完成80 %左右拆模。
The settlement joint belt has been poured previously and gained about 80% of concrete's complete shrinkage, and simultaneously the form stripping were carried out.
在现代建筑施工中,为了解决混凝土收缩、不均匀沉降等问题往往设置了后浇带。
The latter cast belt is usually set up in order to resist the contraction and uneven settlement of concrete in modern construction.
混凝土结构中经常遇到超长的问题,本文就混凝土结构超长的温度缝和沉降缝是否均可设后浇带解决的问题,阐述了自己的观点。
This paper states the viewpoint that the exceeding long temperature crack and settlement crack in concrete structure can be solved by later casting zone.