... Wind turbine foundation 风机基础 steam turbine-generator foundation 汽轮发电机基础 acceptance check of turbine foundation 汽机基础验收 ...
基于1个网页-相关网页
汽轮发电机基础中心线 center line of T/G foundation
对汽轮发电机基础的设计要达到保证整个机组正常运行的目标一直是人们关心的问题。
It is always a major concern for the design of T-G foundations to approach to the target of T-G unit set in good operation.
从DCS系统得到的实时数据的完整性和准确性是汽轮发电机组优化操作专家系统的基础。
The integrity and accuracy of the real-time data acquired by DCS are the foundation of turbogenerator optimizing operating expert system.
采用模型模态试验方法对汽轮发电机组框架式基础的振动特性进行了研究。
In this paper, the vibration characteristics of frame foundation for steam turbine-generator set are performed by model modal test method.
应用推荐