水电资源开发规划
基于1个网页-相关网页
Hydropower resource development planning
以上为机器翻译结果,长、整句建议使用 人工翻译 。
为了有效、合理地开发利用这些资源,在原电力工业部主持下,经过数次规划,于1989年形成了现在的十二大水电基地。
In order to develop and utilize such resources effectively and rationally, under the direction of the former Ministry of power Industry, a plan of 12 large sized hydropower bases was formed in 1989.
youdao
应用推荐
模块上移
模块下移
不移动