主要介绍北京地铁东单车站采用洞桩支承法进行车站主体工程施工的方法。
The paper mainly describes the method of piling in pilot tunnel used in construction of the principal part of Dongdan Subway Station in Beijing.
本发明公开了一种气压沉箱锚桩支承装置,包括垫块、千斤顶,钢托架,锚桩,桩顶扩大头。
The anchor pile support apparatus for pneumatic caisson includes bearing block, jack, steel bracket, anchor pile and expanded pile head.
采用现行规范规定的对桩身承载力和地基土对桩的支承阻力两项的计算,确定嵌岩桩竖向抗压静载试验的试验荷载。
Based on the demand of present code, using the calculation of bearing capacity of pile shaft and subgrade bearing capacity for pile, vertical experimental load of embedded rock pile is ensured.
应用推荐