为了最大化利用狭窄地段的可用面积,外墙和水平防水屋顶都在基地进行组装,然后用起重机沿着地块线倾斜到适当位置。
To maximize the useable area of the narrow lot, the exterior walls were assembled and waterproofing installed horizontally on site and then tilted into position along the property lines with a crane.
倾斜地表下压力隧洞最易出现水力劈裂现象的不利位置是围岩拉应力蝶形区伸展最大的方位;
The potential hydrosplitting of rocks around pressure tunnel is taken into account and it will appear in the extended orientation of butterfly.
应用推荐