监测工程师可利用流量建模技术进行单井性能分析,确保最优化生产。
Surveillance engineers performing performance analyses with flow rate modeling to ensure optimal production.
物料需求计划系统的目的是准时生产,减少库存,以实现单个企业内部的最优化生产。
MRP system is aimed at the production time and reduce inventory in order to achieve a single enterprise to optimize production.
着重介绍了最优化生产技术的基本思想、作业计划方法及其在盐化工设备改造中的应用。
This paper focuses on the fundamental theory, operation planning process of optimized production technology and its application on modification of salt and chemical making equipment.
应用推荐