对于调峰机组,当负荷变化时机组的过程模型甚至结构参数都具有明显的快时变特性。
For peak load unit, its process model and structure parameters have obviously fast time-varying characteristic while load changing.
提出应该按部分负荷时冷却水进水温度变与不变两种情况分别建立中国的IPLV计算公式。
Puts that the computation formula of IPLV for China should be constructed according to the temperature of cooling water is invariable or variable under part load.
根据电力系统实际运行中负荷不断变化的情况,提出了一种新的电力系统时变无功优化算法。
A new algorithm is proposed in the paper for time-varying reactive power optimization according to the load variation.
应用推荐