从施工顺序和合理间距两方面进行数值分析,从而使得实际隧道施工方案得到优化。
Based on analysis on the two aspects as construction sequence and proper distance, the practical construction scheme is optimized.
最后,论文通过实体试验段工程分析了隧道内连续配筋混凝土路面板及其端部锚固的施工工艺及组织顺序,并给出了相应的质量检验标准。
Finally, through the pilot the paper analyzed the construction sequence of the CRCP and its end fixing equipment, and the corresponding quality checking standards.
课题以安徽省埠宁高速公路高边坡路堑爆破开挖为研究对象,重点分析了影响爆破效果的参数及其合理的施工顺序。
We research the digging of blasting in the Chu-Ning expressway high slope cutting of Anhui Province, factors of influence the parameter of blasting result and choose rational working procedure.
应用推荐