...设计、采购和施工合同 (Engineering Procurement Construction) GC Contract: 施工总包合同 (General Construction Contract) BTG BOP: 主机岛和附属设施(Boiler Turbine Generator Balance of Plant) 9 返回章重点 退出 Contract ITB: 招标文件说明 (...
基于12个网页-相关网页
施工合同履约阶段是合同管理的重要阶段,从我国施工企业目前合同管理的现状出发,对提高我国施工企业总承包合同管理水平进行了探讨。
To research how to make construction enterprises to get rid of present dilemma by improving the level of general contracting management and hence advancing their competence, is the topic of the paper.
鉴于甲方与建设单位签订了工程建设总包合同,其中包括电缆沟施工项目需要专业施工分包人完成;
WHEREAS party A have, with the Owner, concluded the general contract of engineering construction which is inclusive of cable trench project needed professional constructor to complete;
应用推荐