从商品混凝土原材料方面控制、设计方面、施工技术控制和施工后期商品混凝土的养护等方面提出了预防措施。
The preventive measures are put forward from the aspects of concrete control of raw materials, design, construction technology and construction control of concrete products post-curing.
塑山工程成功完成的因数有:施工材料,工地管理,技术人员的技术水平,还有就是后期的维护。
Plastic Mountain project successfully completed the factors are: construction materials, site management, technical personnel, technical level, there is the latter part of the maintenance.
利用反演所得的参数可进一步对软粘土地基后期沉降做出更为精确的预测,以指导设计和控制施工。
Through this estimate, one more precise prediction for the soft clay ground afterward settlement can be made to guide the design and control the construction.
应用推荐