本合同段控制性关键工程是预应力砼连续组合箱梁的施工。
The controlled crucial works for this contract section is the construction for the prestressed concrete continuous combined box beam.
本文就襄十高速公路第12合同段高墩柱施工实践谈几点体会。
This paper introduces the construction practice of the high piers and columns of No. 12 Contract Section of Xiangyang-Shiyan Expressway.
介绍西江下游航道整治C1合同段蟠龙石炸礁工程施工方法,可为类似工程提供借鉴。
This paper presents the construction method of reef blasting of Contract Section C1 in Downstream Regulation Engineering of Xijiang River, which may serve as a reference for similar projects.