监测结果表明隧道稳定,说明施工优化建议合理。
The monitoring results show that the tunnel is stable, which proves that the Suggestions for construction optimization are reasonable.
还讨论了空间效应、加固效应以及施工优化方案,论证了隧洞的稳定性。
Finally, the space effect, reinforcing effect as well as the optimizing construction scheme are also discussed; and the stability of the tunnel is demonstrated too.
提供整个项目的价值工程投入,提出设计和施工优化方案以降低成本,提高质量,并缩短工期;
Provide value engineering input throughout the project and propose changes to the design and construction to reduce cost, enhance quality and shorten the project schedule;