上层建筑整体吊装是船舶建造中一项新工艺。
Superstructure assembly of prefabrication is new technique of ship building.
介绍同时使用8台卷扬机整体吊装钢网架及其吊挂观光平台的施工技术。
This paper introduces the installation technology for integral lifting of the steel rack and sightseeing platform with 8 hoisters at the same time.
针对该网架的工程特点及现场的具体情况,决定采用绞磨拔杆整体吊装方法。
According to engineering characters and concrete situation the winching and rocker integral hoisting method is adopted.