MLM公司在设计阶段为了评估各种可供选择的建筑体系开发了一个热学模型,实际产生的能源成本被密切监视着,并和这个热学模型的预测进行比较。
The resulting energy costs were closely monitored against the projections of a thermal model that MLM had developed at the design stage to enable evaluations of alternate construction systems.
这个人员配备模型(如果“模型”这个词听起来太正式,可换成“图”)将通过对成本适时的评估提供所需的全部成本评估。
This staffing model (or "map" if the word "model" sounds too formal) will provide input to the overall cost estimate by establishing timing for the costs.
并以合同风险评价、风险处置能力评估、风险策略成本测算为依托,提出了基于工程动态运行的合同风险分配模型。
By contract risk evaluation, risk disposal ability evaluation and risk strategy cost calculation, proposes the contract risk allocation model based on engineering dynastic operation.
应用推荐