进而对实时会计信息系统涉及到的资金、成本、会计报表等进行分析,研究这些要素的实时运行和控制。
Then to analyze the capital, cost, accounting statement... etc. that involving the information system, study real-time operation and control of these factors.
其次对项目中涉及到的成本类型进行了研究,然后结合稽征网络管理信息系统的特点制定出了成本计划和控制措施。
Then, through analyzing the cost involved in project management, it formulates the cost plan and control measure for this project.
应用推荐