快速固结试验法采用各级压力下固结24h 作为稳定标准, 一方面考虑大多数土的变形在24h 能达到稳定, 另一方面是方便每天在同一时间加荷和测记变形读数。其主导思想还是尽量保证每级压力下土样变形达到稳定。
试验结果表明:在常规压力增量下,用快速固结试验法测得压缩性指标可以满足一般工程的需要。
The test result shows that Quick consolidated test can meet the requirement of usual project under the conventional increment of pressure.
为缩短固结试验周期,采用间隔2小时逐级加荷快速试验法。
In order to shorten the consolidation test cycle, the 2-hour interval staged-loading fast testing method is adopted.
通过现场原位观测试验,研究波浪、潮流水动力作用对快速堆积的黄河口沉积物固结强度的影响。
Based on in-situ tests, the impact of Marine hydrodynamics, such as waves and tides, on the consolidation process of rapidly deposited sediments is studied.
应用推荐