... initial water production 初产水量 initial production check 开始生产检验 initial production pumping 初始抽油产量 ...
基于10个网页-相关网页
采购或生产制造开始之前,合同专业检验试验计划(itp)应充分明确检查、无损检验(nde)和性能试验介入点。
Prior to procurement or commencement of manufacture, the inspection, NDE and performance testing intervention points shall be adequately defined in a contract specific inspection and test plan (ITP).
是否在开始生产国产前,对钻孔程序进行检验?
Is the drilling program checked prior to being released for production?
在生产开始时,由操作工和车间检验员进行首检。
Operators and inspectors do the first piece inspection at the beginning of production.