最后,应用等时相控随机模拟方法建立了三维可视化的储层地质模型。
Finally, isochronal facies-restrained stochastic modeling method is used to build up the 3-d reservoir model.
建立三维地质模型的终极目的是更细致,正确地研究地下的油躲,为油躲开发提供可靠依据。
The ultimate goal of 3d geological model is to make the study of the underground reservoir more detailed and accurate, and provide a reliable basis for reservoir development.
同时建立相应的地质信息数据库,将三维地质模型与数据库信息链接起来,实现工程地质信息的可视化管理与查询。
At the same time, setting up relevant database of geological information, to link 3d geological model to information in database for visual management and inquiry.
应用推荐