1998年汛期隔河岩水利枢纽观测部位为深孔、表孔及消能工。
Monitoring observation localization for Geheyan Project in 1998 flood season was the deep outlets, the surface spillway, the still basin and auxiliary energy dissipators.
2005年汛期热带气旋预报表明,系统对热带气旋的路径和暴雨的预报效果较好。
The tropical cyclone forecast in the flood season in 2005 indicated that the system was suitable to the tropic cyclone route forecast and rainstorm forecast.
对1997年汛期降水预测所做的综合决策表明,该方法具有较好的综合决策能力。
This method has been proved to have quite good synthetic decision abilities through the synthetic decision making in the forecasts of the precipitation in the 1997's flood season.
应用推荐