英国石油对包括77亿美元的费用在内的非经营性项目进行调整后,第三季度重置成本利润为55亿美元,比去年同期增加18%,超过市场预测的46亿美元。
Adjusting for non-operating items, including the $7.7 billion charge, replacement cost profit was $5.5 billion, up 18% on the year-ago quarter, and topping the consensus forecast of $4.6 billion.
归纳总结了适用于桉树林木资产评估的三种方法:重置成本法、收获现值法、市场价倒算法。
The article introduces three assets evaluation methods on Eucalyptus forest: replacement cost method, present earning value method and market-based forest value method.
评估主要采用重置成本法,同时结合市场法进行。
In the evaluation process, replacement cost method was used concurrently with the market method.
应用推荐