工程预可行性分析是桥梁和隧道建设前期工作的重点组成部分,往往成为项目立项的控制性因素。
Project pre-feasibility analysis, a crucial part of bridge and tunnel preparatory work construction, often becomes a controlling factor of a project.
而WBS方法为工程项目管理与计算机技术之间架起了一座桥梁。
The WBS method is the bridge between project management and computer science.
该项典礼以社会各界同参与为主题,并以海、陆、空表演象征机场核心计划中公路、隧道、填海工程、桥梁及机场等项目。
The ceremony was built around a theme of community participation, and symbolised the land, sea, and air components - highways, tunnels, reclamations, Bridges and the airport - of the ACP.
应用推荐