对民航座椅工时定额制定方法进行研究,建立了工时定额系统总体结构,并提出了其实现方法。
The structure frame of the man-hour quota calculation and its development for the civil aviation seats manufacturing are presented.
准确地计算中间产品加工工时定额是制定合理生产计划的基础。
A rational production plan is based on accurate estimation on manhour of interim product.
以工艺标准化为基础,研究了制定典型工序的工时定额标准技术。
On the basis of the standardized processes, the technology of setting standard Time criterion of the typical procedure is researched.
应用推荐