【毕业论文】 管理科学与工程类__题目:多目标船舶调度优化问题蚁群算法研究 - docin.com豆丁网 题(GraphColoring Problem, GCP)(Salari和Eshghi,2005)、工件排序问题(Job-shopScheduling Problem, JSP)(Huang和Yang,2008)、度约束最小树问题(Degree—Constrained Mini
基于6个网页-相关网页
...in.com豆丁网 题(GraphColoring Problem, GCP)(Salari和Eshghi,2005)、工件排序问题(Job-shopScheduling Problem, JSP)(Huang和Yang,2008)、度约束最小树问题(Degree—Constrained Mini..
基于1个网页-相关网页
通过分析飞机运行的时区集合特点,将飞机调度问题转化为固定工件排序问题。
In order to solve airline aircraft dispatching problem which is NPC problem, time intervals which aircraft processes are analyzed.
基于交货期的模具车间作业调度问题是解决不同类型工件的加工排序,使其误工最少。
The mould manufacture scheduling based on due date is a problem of how to schedule operation processing sequence to minimize tardiness.
结果表明,所提出算法至少可以求解25个工件规模的越库配送排序问题。
The computational experiments show that the proposed DP algorithm can handle problems up to at least 25 jobs.
应用推荐