...ly corrective actions) 5提出改善的永久性对策 (Permanent corrective actions) 6对策有效性验证 (Effectiveness verification) 7预防问题再发生的措施 (Preventive reoccur measures) 8结案报告的提出 (End a case))非常熟悉,并且有一年半的实践经验 自我评...
基于20个网页-相关网页
处理已供应零件的质量问题,协助供应商来驱动相应的对策并验证后续活动,确定其有效性,计算PPM ;
To adjust supplied parts' quality problem, assist supplier to drive appropriate countermeasures accordingly and verify the follow-up activities and its effectiveness subsequently, calculate the PPM;
最后,以深圳市为例进行严重交通拥堵评估并提出应对策略,验证了方法的有效性。
Finally, taking Shenzhen as an example, the paper validates the congestion assessment method as well as the corresponding congestion countermeasures.
将 研究成果应用于工程实例,通过现场监测验证了分析方法及控制 对策的合理性和有效性。
The research achievement was applied to the in situ engineering, the analysis method and control strategy was verified to be scientific, rational and effective through in situ monitoring results.
应用推荐