... 地面干扰发射台 ground jammer 地面检查系统 ground checkout system 地面接口设备 terrestrial interface equipment ...
基于38个网页-相关网页
在对飞船进行最后检查之后,神舟七号计划进入倒计时阶段。 周二早上,运载火箭和地面操作系统已完成对接。
The Shenzhou-VII mission entered the countdown stage after the final check on the spacecraft, the carrier rocket and the ground operation system was completed Tuesday morning.
经过最终的系统检查和高速地面滑行测试以后,飞机将按照计划于本季度晚些时候进行第一次试飞。
After completing final systems checks and high-speed taxi tests, the airplane will be ready for first flight, which is on schedule for later this quarter.
在对飞船进行最后检查之后,神舟七号计划进入倒计时阶段。周二早上,运载火箭和地面操作系统已完成对接。 。
Thee Shenzhou-VII mission entered the countdown stage after the final check on the spacecraft, the carrier rocket and the ground operation system was completed Tuesday morning.
应用推荐